sino iron - cape preston

Department: TSF and Mining

Project scope: Disconnect all services dismantle and relocate a total of 46 modular buildings including all infrastructure.

Electrical, plumbing, HVAC technicians and communications:

  • Disconnect and reconnect all required services to the standard of Australian codes and standards. 

  • Extra power supply and power outlets to all buildings as required by client.

  • Water and drainage supply and water outlets to all areas required by client.

  • Communication/data supply and outlets to all buildings as required by client.

  • Reverse cycle air conditioning outlets to all buildings and containers as required by client.

Carpentry:

  • Disconnect and reconnect flashing and structural tie in and fixing for transport.

  • Carpentry fit-outs of kitchens, ablution facilities, decontamination buildings, laundry.

  • Bench tops, skirting board, floor resurfacing including reinforcement of floor bearers and wall struts 

Crane, rigging and transport:

  • Relocation of all modular buildings, steps, ablution equipment, containers, dome shelters and associated infrastructure.

  • Safe transportation of all equipment from one location to the new location including tie down and reinforcement of internal equipment including fridges tables and associated furniture.

  • Safe direction using radio communications for all logistics involving operators of cranes rigging, trucks and traffic control.

  • Installation and certification of workshop jib crane.

Civil works:

  • Trenching of services including water, electrical,communication and drainage.

  • Survey and levelling of proposed new location and pad.

  • 300m of concrete footpath formed to Australian Standards.

  • Environmental reinstatement of previous location. 

  • Interconnecting roads and services.

  • Storm water runoff planning and shaping.

Boilermaker welders:

  • Including fabrication of all stairs and interconnecting landing platforms.

  • Fabrication and certification of load bearing structures.

Blast and painting:

  • Blast and paint all steel platforms and landings to site specific coating system.

  • HP cleaning of exterior of all building and containers required by client.

  • Paint exterior of all buildings and containers required by client.

Cleaning:

  • Commercial cleaning and handover to client satisfaction as required.