TOTAL CORROSION CONTROL - CAPE PRESTON PORT COMPANY

Department: Outflow/Marine

Areas of scope: Cape Preston Mine Site, 2km of outflow conveyor infrastructure, various barge decking including hatches and manholes and various packages of reclaimer structure.

Project scope:

Supply a full corrosion control solution including masking, covering and encapsulation where necessary, manual rust removal, corrosive blasting and industrial spray painting to 400 microns on 2km of conveyor structure, reclaimer structures and 1000m2 of steel plate flooring including hatches and manholes using international paint specification for interzone 954.

Mechanical fitting services removing and replacing conveyor idlers for 300m along both sides of conveyor.

Complete management of QA/QC of services required to perform the project scope including planning, HSE, supervision and trades below:

Trades, services and equipment:

  • 4.5T truck complete will 2 x 4000psi High Pressure water blast with lance and turbo nozzles.

  • Corrosion control truck complete with 4T garnet bin fitted with associated blast pots and hoses.

  • 1000cfm Atlas Copco trailer compressor and hoses.

  • Garnet, paint and preparation materials as required.

  • Painter and blasting personnel.

  • Mechanical fitters.

  • Supervisor complete with PLI service truck and fitting tools, 3T Hiab.

  • 25T Franna with rigging equipment. 

  • CN operator.

  • Rigging personnel.