SINO IRON CAPE PRESTON
Department: TSF and Mining
Project scope: Disconnect all services dismantle and relocate a total of 46 modular buildings including all infrastructure.
Electrical, plumbing, HVAC technicians and communications:
-
Disconnect and reconnect all required services to the standard of Australian codes and standards.
-
Extra power supply and power outlets to all buildings as required by client.
-
Water and drainage supply and water outlets to all areas required by client.
-
Communication/data supply and outlets to all buildings as required by client.
-
Reverse cycle air conditioning outlets to all buildings and containers as required by client.
Carpentry:
-
Disconnect and reconnect flashing and structural tie in and fixing for transport.
-
Carpentry fit-outs of kitchens, ablution facilities, decontamination buildings, laundry.
-
Bench tops, skirting board, floor resurfacing including reinforcement of floor bearers and wall struts
Crane, rigging and transport:
-
Relocation of all modular buildings, steps, ablution equipment, containers, dome shelters and associated infrastructure.
-
Safe transportation of all equipment from one location to the new location including tie down and reinforcement of internal equipment including fridges tables and associated furniture.
-
Safe direction using radio communications for all logistics involving operators of cranes rigging, trucks and traffic control.
-
Installation and certification of workshop jib crane.
Civil works:
-
Trenching of services including water, electrical,communication and drainage.
-
Survey and levelling of proposed new location and pad.
-
300m of concrete footpath formed to Australian Standards.
-
Environmental reinstatement of previous location.
-
Interconnecting roads and services.
-
Storm water runoff planning and shaping.
Boilermaker welders:
-
Including fabrication of all stairs and interconnecting landing platforms.
-
Fabrication and certification of load bearing structures.
Blast and painting:
-
Blast and paint all steel platforms and landings to site specific coating system.
-
HP cleaning of exterior of all building and containers required by client.
-
Paint exterior of all buildings and containers required by client.
Cleaning:
-
Commercial cleaning and handover to client satisfaction as required.